Project financial analysis, NPV, BCR, IRR, BEP, sensitivity analysisAbstract
Acceleration of development in the 3T (Forefront, Outermost and Disadvantaged) areas is the main goal of the government in supporting economic equality and educational services in the land of Papua. So that Cenderawasih University as an extension of the government plans to build a Teaching Hospital to support the activities and development of Cenderawasih University graduates and carry out health services, research and community services. In this study to analyze the feasibility of this teaching hospital project using the NPV (Net Preset Value), BCR (Benefit Cost Ratio), IRR (Internal Rate Ratio), BEP (Break Even Point) and sensitivity analysis methods to determine whether the hospital The project is feasible or not feasible but it is hoped that the results of the analysis are positive.
References
State Secretariat. Law Number 44 of 2009 concerning Hospitals. Republic of Indonesia State Gazette 2009 Number 44. Jakarta
Berawi, Muhammad Ali, Teuku Yuri M. Zagloel, Abdur Rohim Boy Berawi & Yusuf Abdurachman. 2015. Feasibility analysis of Trans-Sumatra toll road using value engineering. International Journal of Technology.
Hasan, SA, AD Albdiri & AH Mohsen. 2018. Feasibility study and economic assessment for Al-Qadisiyah University Hospital of Specialized Surgery. International Journal of Civil Engineering and Technology (IJCIET).
Irawan, Feri Eka, Hasan Zaini, Kartono Wibowo & Nafiah. 2020. Analysis of the economic feasibility of building the Sadewa building at RSUD KRMT Wongsonegorokota Semarang. Proceedings of the UNISSULA Student Scientific Conference (KIMU) 4.
Modisty, Nadya, Ika Kustiani & Reza Asriandi Ekaputra. 2018. Engineering Investment Analysis for the Construction of Public Lecture Buildings and ITERA Engineering Laboratories. ITERA Faculty of Engineering Journal.
Putri, Shinta Retno, Saifoe El Unas & M. Hamzah Hasyim. 2013. Feasibility study on the Dinoyo Mall development project, Malang City. Journal of Civil Engineering/ Volume 7, No. 3.
Rusim, Dewi Ana, Herman Parung, MW Tjaronge & Rusdi Uman Latief. 2018. Modeling of risk and response to risk for road infrastructure development viewed from the contractor side (case study: construction industry in Papua) . International Journal of Civil Engineering and Technology (IJCIET).
Sari, Nurwanda & Ananda Agneshia Putri. 2020. Preliminary Technical Feasibility Analysis, Operational, Economic Of Radin Inten II International Airports Trains, South Lampung. IOP Conference Series: Earth and Environmental Science.
Susanti, Junita Eka & Miskar Maini. 2019. Economic Feasibility Analysis of the Bangka Regency Sports Hall (GOR) Construction Project. Journal of Civil Engineering, Faculty of Engineering, Bangka Belitung University.
Cashmere & Jakfar. 2012. Business Feasibility Study. Eighth Printing. Jakarta: Kencana.
Republic of Indonesia Ministry of Health. 2009. about Hospitals. Jakarta: Republic of Indonesia Ministry of Health.
Giatman, M., 2006, Engineering Economics, North Jakarta, Rajawali Pers
Ministry of Law and Human Rights. Republic of Indonesia Government Regulation Number 93 of 2015. Republic of Indonesia State Gazette 2015 Number 293, Supplement to Republic of Indonesia State Gazette Number 5777. Jakarta.
Ministry of Health. Ministry of Health Regulation Number 26 of 2022. Jakarta.
Wallen, Fraenkel & Riyanto, Yatim. 1996. Hypothesis
State Secretariat. Government Regulation Number 93 of 1995 concerning Teaching Hospitals. Jakarta.
Damayanti, Syarifah. 2021. Analysis of Budget Plans and Financial Feasibility for the Construction of the Jayapura Port Apron. Thesis, Cenderawasih University.
Gunawan, MM 2018. Calculation of Construction Costs and Financial Feasibility Analysis for the Construction of the Moanamani Micro Hydro Power Plant (PLTMH) in Dogiyai Regency. Thesis, Cenderawasih University.
Kotler and Armstrong. 2001. Marketing Principles. Jakarta: Erlangga
Kartika, Deviany, Miftahul Arifin & Rahman Darmawan. 2010. Selection of Alternative Potential Water Resources in the Brantas Watershed Area to be Developed into a Hydroelectric Power Plant (PLTA) . ITN Malang FTSP Spectra Journal.
Published
Issue
Section
License
Copyright (c) 2023 Muhamad Suliswanto, Dewi Ana Rusim, Apolo Safanpo
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Authors who publish with this journal agree to the following terms:
- Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution-ShareAlike 4.0 International. that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal.
- Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.
- Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work.