ANALYSIS OF THE ROLE OF OWNER AND PROJECT MANAGER IN THE PERFORMANCE OF DESIGN AND BUILD CONTRACTS (CASE STUDY OF RUMAH SAKIT SURABAYA TIMUR (RSST) PROJECT)

Authors

  • Dicky Rianda Perdana Universitas 17 Agustus 1945 Surabaya
  • Andi Patriadi Universitas 17 Agustus 1945 Surabaya
  • Sajiyo Sajiyo Universitas 17 Agustus 1945 Surabaya

DOI:

https://doi.org/10.46799/ijssr.v5i2.1176

Keywords:

design and build, multiple linear regression, pearson correlation, project risk, time performance

Abstract

The construction industry plays a significant role in infrastructure development, including healthcare facilities like hospitals. This research aims to comprehensively identify, analyze, and evaluate the impact of design and build risk factors on the time performance of hospital construction projects. The study focuses on two main objectives: first, to analyze the impact variables related to owner and project manager factors on project time performance; and second, to develop effective mitigation strategies to manage and minimize these risks during implementation. The analysis process included data cleaning and verification, validity and reliability testing, descriptive analysis, Pearson correlation analysis, and multiple linear regression analysis to evaluate the relationships between risk factors and the success of the hospital construction project. The results show that the Owner and Project Manager (PM) factors include several key variables with strong to perfect and significant correlations to project success, particularly key variables within each category. Project success is significantly influenced by the effective management of risk factors with high and significant correlatives, especially key variables in each category, namely, Project Management Competence (PM). This research contributes to the construction industry by providing insights and practical strategies tailored to the complexities of healthcare infrastructure, thereby advancing the development of risk management practices in this critical sector.

References

Abbasi, O., Noorzai, E., Gharouni Jafari, K., & Golabchi, M. (2020). Exploring the Causes of Delays in Construction Industry Using a Cause-and-Effect Diagram: Case Study for Iran. Journal of Architectural Engineering, 26(3). https://doi.org/10.1061/(asce)ae.1943-5568.0000431

Adafin, J., Rotimi, J. O. B., & Wilkinson, S. (2021). An evaluation of risk factors impacting project budget performance in New Zealand. Journal of Engineering, Design and Technology, 19(1). https://doi.org/10.1108/JEDT-03-2019-0056

El-Sayegh, S. M., Manjikian, S., Ibrahim, A., Abouelyousr, A., & Jabbour, R. (2021). Risk identification and assessment in sustainable construction projects in the UAE. International Journal of Construction Management, 21(4). https://doi.org/10.1080/15623599.2018.1536963

Gunduz, M., & Al-Naimi, N. H. (2022). Construction projects delay mitigation using integrated balanced scorecard and quality function deployment. Engineering, Construction and Architectural Management, 29(5). https://doi.org/10.1108/ECAM-12-2020-1082

Hamad, R. J. A., Tayeh, B. A., & Aisri, H. A. A. (2021). Critical factors affecting the success of construction projects in oman. Journal of Sustainable Architecture and Civil Engineering, 29(2). https://doi.org/10.5755/j01.sace.29.2.29269

Jafari, K. G., & Noorzai, E. (2021). Selecting the Most Appropriate Project Manager to Improve the Performance of the Occupational Groups in Road Construction Projects in Warm Regions. Journal of Construction Engineering and Management, 147(10). https://doi.org/10.1061/(asce)co.1943-7862.0002151

Khaled, F. J., Jawdat, F., & Khalid, I. (2019). The Impact of Poor Planning and Management on the Duration of Construction Projects: A Review. Jordan University of Science and Technology, 1(4).

Li, C. Z., Hong, J., Xue, F., Shen, G. Q., Xu, X., & Mok, M. K. (2016). Schedule risks in prefabrication housing production in Hong Kong: a social network analysis. Journal of Cleaner Production, 134(Part B). https://doi.org/10.1016/j.jclepro.2016.02.123

Li, Q., Chong, H.-Y., Lee, C.-Y., & Zhang, Y. (2021). BIM’s Formal and Informal Collaborative Networks in Traditional Procurement: Insights from the Construction Phase of a Hospital Case Study. Journal of Management in Engineering, 37(6). https://doi.org/10.1061/(asce)me.1943-5479.0000965

Luo, L., Qiping Shen, G., Xu, G., Liu, Y., & Wang, Y. (2019). Stakeholder-Associated Supply Chain Risks and Their Interactions in a Prefabricated Building Project in Hong Kong. Journal of Management in Engineering, 35(2). https://doi.org/10.1061/(asce)me.1943-5479.0000675

Mahamid, I. (2021). Effects of design quality on delay in residential construction projects. Journal of Sustainable Architecture and Civil Engineering, 28(1). https://doi.org/10.5755/j01.sace.28.1.20531

Mohammadi, A., Tavakolan, M., & Khosravi, Y. (2018). Factors influencing safety performance on construction projects: A review. In Safety Science (Vol. 109). https://doi.org/10.1016/j.ssci.2018.06.017

Nabi, M. A., & El-adaway, I. H. (2021). Understanding the Key Risks Affecting Cost and Schedule Performance of Modular Construction Projects. Journal of Management in Engineering, 37(4). https://doi.org/10.1061/(asce)me.1943-5479.0000917

Ogbeifun, E., & Pretorius, J. H. C. (2022). INVESTIGATION OF FACTORS RESPONSIBLE FOR DELAYS IN THE EXECUTION OF ADEQUATELY FUNDED CONSTRUCTION PROJECTS. Engineering Management in Production and Services, 14(1). https://doi.org/10.2478/emj-2022-0008

Patriadi, A., Soemitro, R. A. A., Warnana, D. D., Wardoyo, W., Mukunoki, T., Tsujimoto, G., Maulana, M. A., & Satrya, T. R. (2022). Loading Criteria and Deposit Layer Characteristics as Causes of Sediment Settlement in an Estuary. Journal of Marine Science and Engineering, 10(1). https://doi.org/10.3390/jmse10010027

Rehman, M. S. U., Thaheem, M. J., Nasir, A. R., & Khan, K. I. A. (2022). Project schedule risk management through building information modelling. International Journal of Construction Management, 22(8). https://doi.org/10.1080/15623599.2020.1728606

Santoso, D. S., & Gallage, P. G. M. P. (2020). Critical factors affecting the performance of large construction projects in developing countries: A case study of Sri Lanka. Journal of Engineering, Design and Technology, 18(3). https://doi.org/10.1108/JEDT-05-2019-0130

Shibani, A., Hasan, D., Saaifan, J., Sabboubeh, H., Eltaip, M., Saidani, M., & Gherbal, N. (2022). Financial risk management in the construction projects. Journal of King Saud University - Engineering Sciences. https://doi.org/10.1016/j.jksues.2022.05.001

Smith, J., Edwards, D. J., Martek, I., Chileshe, N., Hayhow, S., & Roberts, C. J. (2023). The antecedents of construction project change: an analysis of design and build procurement application. Journal of Engineering, Design and Technology, 21(3). https://doi.org/10.1108/JEDT-12-2020-0507

Tarigan, A. M., Abdullah, A., & Rani, H. A. (2018). FAKTOR-FAKTOR RISIKO DESIGN AND BUILD YANG MEMPENGARUHI KESUKSESAN PROYEK REHABILITASI TOTAL GEDUNG PENDIDIKAN DI PROVINSI DAERAH KHUSUS IBUKOTA JAKARTA. Jurnal Arsip Rekayasa Sipil Dan Perencanaan, 1(2). https://doi.org/10.24815/jarsp.v1i2.10962

Tumanggor, A. I., & Simanjuntak, R. M. (2019). IDENTIFIKASI FAKTOR DAN VARIABEL RISIKO PENYEDIA JASA KONSTRUKSI DESIGN AND BUILD KAWASAN BANGUNAN GEDUNG APARTEMEN. TECHNOPEX 2019.

Zhang, W., Lee, M. W., Jaillon, L., & Poon, C. S. (2018). The hindrance to using prefabrication in Hong Kong’s building industry. Journal of Cleaner Production, 204. https://doi.org/10.1016/j.jclepro.2018.08.190

Downloads

Published

2025-02-18